Gallery
Malmö Module
Projects offer a variety of interior and exterior finishing options, as well as the flexibility to make changes to room layouts.
Assembly Process for the Vitolu Street Project
Our priority is to provide clients not only with visual and functional satisfaction but also long-term value by utilizing the most reliable technologies for home sustainability and energy efficiency. We believe that a high-quality construction process enhances the well-being of both the home and its surrounding environment.
Transporting the Visby Module
The Modern House team is delighted and grateful for every client’s trust and choice. This time, our wooden frame module, Visby, was transported to Aluksne!
Transporting the Frölunda Module
An open-type cargo platform was used for transporting the modular home. The placement of the building onto the platform and onto the pre-prepared columnar foundations was carried out using a crane.
SKC and Eltpams
SKC is used to ensure sufficient insulation and eliminate air gaps between wooden joints. Eltpams serves as a waterproofing layer, adhered to the concrete with Butyrub. Paroc XSS01 200mm is utilized to seal and insulate the connections between walls and foundations.
Additionally, Siga Fentrim adhesive tapes are applied on the exterior to ensure airtightness, while Siga Rissan is used on the interior for the same purpose.