Modular houses
Choose your package
Price from EUR 42 030,00
Price from EUR 77 120,00
Mobile modular timber frame house. This type of house is relatively quick to build and does not take a long time to confirm the project.
This project does not require a building permit (up to 60m²) and can be lived in immediately.
The projects offer a variety of interior and exterior finishes, as well as room layouts.
Living area : 40.95 m2
Construction area : 52.00 m2
-
Bedrooms
2
-
Living room with kitchen area
1
-
Bathroom
1
-
Attic
-
-
Sauna
1
-
Terrace
-
Technical specification
Basic | Complete | |
---|---|---|
Natural slate SAMACA-55 STD 5 (400x250mm) screwed to the elements |
|
|
Mouse barrier at the bottom perimeter |
|
|
Battens (25x100mm) |
|
|
Battens (25x50mm) |
|
|
Diffusion membrane (Siga Majcoat) |
|
|
Windproof gypsum board Norgips GU (9.5mm) |
|
|
Wooden frame C24 (45x145mm) |
|
|
Thermal insulation Isover KL 35 (150mm) |
|
|
Vapor barrier (Siga Majpel 5) |
|
|
Battens (45x45mm) |
|
|
Thermal insulation Isover KL 35 (50mm) |
|
|
OSB 3 (10mm) |
|
|
Gypsum board GKB (12.5mm) |
|
|
Plywood (Pine) (15mm) (in the bathroom) |
|
|
Gypsum board GKBI (12.5mm) (in the bathroom) |
|
|
Basic | Complete | |
---|---|---|
Gypsum board GKB (12.5mm) |
|
|
OSB 3 (10mm) |
|
|
Wooden frame (45x95mm) |
|
|
Thermal insulation Isover KL 35 (100mm) |
|
|
OSB 3 (10mm) |
|
|
Gypsum board GKB (12.5mm) |
|
|
Plywood (Pine) (15mm) (in the bathroom) |
|
|
Gypsum board GKBI (12.5mm) (in the bathroom) |
|
|
Basic | Complete | |
---|---|---|
OSB 22mm |
|
|
Vapor barrier (Siga Majpel 5) |
|
|
Wooden frame C24 (45x220mm) |
|
|
Thermal insulation Isover KL 35 (200mm) |
|
|
Cembrit Windstopper Extreme 9mm |
|
|
Battens (25x100mm) |
|
|
Skirting finish with metal elements |
|
|
Basic | Complete | |
---|---|---|
Toode Classic PURAL MATT or equivalent |
|
|
Metal elements |
|
|
Icopal FleX Plus underlay |
|
|
Full wooden decking 21x110mm |
|
|
Battens (45x45mm) |
|
|
Diffusion membrane (Siga Majcoat 200) |
|
|
Wooden frame C24 (45x195mm) |
|
|
Thermal insulation Isover KL 35 (200mm) |
|
|
Vapor barrier (Siga Majpel 5) |
|
|
Battens (45x45mm) |
|
|
Thermal insulation Isover KL 35 (50mm) |
|
|
Basic | Complete | |
---|---|---|
PVC windows, 6-chamber Bruugman Salamander bluEnergy profile with triple-glazed package, dual-sided color Anthracite |
|
|
External metal window sills PURAL MATT |
|
|
External window opening finish with metal elements PURAL MATT |
|
|
MDF internal window sills |
|
|
Interior Doors |
|
|
Solid wood interior doors NCS S5000N |
|
|
Wall, Ceiling, and Floor Finishing |
|
|
Wall and ceiling plastering |
|
|
Wall and ceiling painting (primer and two coats of paint) |
|
|
Waterproofing installation |
|
|
Creation of the sloping layer in the bathroom |
|
|
Wall tiling (600x600mm) (€33/m²) |
|
|
Floor tiling (600x600mm) (€33/m²) |
|
|
Kitchen wall tiling (100x200mm) (€33/m²) |
|
|
Boen oak parquet (Espressivo Warm Cotton LP PEG8Z3FE) (€33/m²) with underlay |
|
|
Painted MDF skirting boards (12x56mm) |
|
|
Huntonit Antikk ceiling panels NCS S 0500N |
|
|
Basic | Complete | |
---|---|---|
Kitchen furniture – laminated fiberboard body, solid oak surface, painted MDF fronts, BLUM hardware with soft-close mechanisms |
|
|
Induction cooktop Electrolux LIT30230C |
|
|
Extractor hood Faber INKA PLUS HCSBKA52 |
|
|
Built-in refrigerator Whirlpool ARG 585 |
|
|
Built-in microwave Bosch BFL524MB0 |
|
|
Faucet Franke SIRIUS L 115.0668.279 |
|
|
Sink Franke SID 610 114.0368.467 |
|
|
Basic | Complete | |
---|---|---|
Toilet with SC lid The Gap Round Rimless Compact, white |
|
|
Sink with cabinet – HÖRVIK/GODMORGON/TOLKEN (60x49x72) |
|
|
Water heater O'PRO+ H-80L 1500W Atlantic |
|
|
Concealed shower mixer set HERZ SQ, black |
|
|
Shower corner Vento Napoli 80x80 |
|
|
Basic | Complete | |
---|---|---|
Sewer and water supply installation |
|
|
Embedding of sewer and water pipes in floor and wall constructions |
|
|
Basic | Complete | |
---|---|---|
Installation of ventilation exhaust in the bathroom |
|
|
Installation of fresh air intake valve Fresh F90 D102 |
|
|
Basic | Complete | |
---|---|---|
Electrical supply installation |
|
|
Conduit and cable installation |
|
|
Distribution board installation |
|
|
Installation of sockets and switches (Jung LS 990 series, white) |
|
|
Installation of spotlights (Philips Meson) |
|
|
Basic | Complete | |
---|---|---|
Preparation of pile foundations |
|
|
Transport of the modular house |
|
|
Frequently asked questions
Yes, we can adapt the designs to your preferences or create something entirely custom.
Yes, by separate agreement, we can handle all documentation tasks, from coordinating the building permit to the building’s commissioning.
Yes, you will have the opportunity to fully customize the interior of the house to your preferences. We will coordinate all interior designs and materials with you during the process. Items such as tiles, flooring, electrical appliances, and bathroom fixtures can be selected from our offer, our partners, or any supplier of your choice.
You can find the house’s technical specifications and descriptions of included items on our website under each respective product, by selecting the appropriate package.
By prior arrangement, we can arrange a visit to one of our completed projects. We are always open to showing you a project that is still under construction, which is a great opportunity to see what the house consists of. At our factory in Lauku street 1, Sigulda, you can also view demo modular homes, and we would be happy to show and explain the manufacturing process to you.
If you choose one of our standard products from the offering, the completion time for a modular house would be 10 to 14 weeks. If changes are made or a custom-designed project is ordered, the timeline may slightly increase. For private homes, the construction timeline from receiving the building permit and starting work on-site to the completed house is 4 to 6 months, depending on the chosen project.
20% of the contract amount – upon signing the contract
40% of the contract amount – before the start of the modular house production
30% of the contract amount – before the start of interior finishing work
10% of the contract amount – after signing the acceptance/handover certificate
For private houses, the payment procedure is agreed upon before signing the contract, depending on the scope of work and the customer’s financing method.