Gallery
Foundation Construction on Svīres Street
The slab foundation construction on Svīres Street includes soil preparation, formwork and reinforcement installation, followed by concrete pouring and curing. The process is completed with surface finishing and waterproofing to ensure durability and stability.
Assembly Process at Svires Street 1, Sigulda
Take a look at how your dream home is coming to life!
Svires Street Project Assembly Process
Take a look at how the new residential housing project in Sigulda, Svīres Street, is coming to life!
Pressure Test
Before conducting the building’s pressure test, all installation work for utilities crossing the structures (electrical cables, water and sewage pipes, and ventilation ducts) is completed. This allows us to objectively verify the quality of the work done and ensure the proper sealing of all enclosing structures.
During the test, we are always present to address any issues if needed. Only after completing these steps do we proceed with further work, ensuring that the enclosing structures are no longer penetrated. The pressure test serves both as our internal quality check and as proof to the client that even the elements that are no longer visible after the home’s completion have been executed correctly.
Malmö Module
Projects offer a variety of interior and exterior finishing options, as well as the flexibility to make changes to room layouts.