Private houses

Choose your package

Price from EUR 189 698,12

Foundation construction

Installation of utilities (water, sewerage, underfloor heating, electricity supply) in the foundations

Assembly of house structures

Fully completed external finish works

Price on individual request

Foundation construction

Installation of internal utilities (water, sewerage, electricity, ventilation)

Assembly of house structures

Fully completed external finish and installation of panel materials (OSB, plywood, drywall)

Price from EUR 293 038,97

Foundation construction

Installation of internal utilities (water, sewerage, electricity, ventilation)

Assembly of house structures

Fully completed internal and external finish works

Installed kitchen equipment with appliances and furnished bathrooms


The project is designed with a practical, thoughtful layout and modern visual solutions. The house concept is developed to achieve an A+ energy efficiency rating, which will positively impact low monthly utility costs.

The construction of the building will use the extensive experience gained from building and exporting houses to Sweden, and every customer review serves as proof of the quality guarantee.

When designing and building houses, we think long-term about the client’s needs, which is reflected in the visual design and the use of high-quality wooden frame technology.

Living area : 159.90 m2

Construction area : 221.00 m2


  • Bedrooms
    2
  • Living room with kitchen area
    1
  • Office room
    1
  • Bathrooms
    2
  • Attic floor
  • Garage 32,8 m2
    1
  • Terrace
  • Storage

Technical specification

Basic Middle Complete
Architectural Solutions
General Plan of the Construction Project
Building Structures
Temporary Energy Certificate for the Building
Work Organization Project
Production Drawings
Topographic Survey
Geotechnical Investigation
External Water Supply and Sewerage
External Power Supply
Internal Water Supply and Sewerage - Conceptual Design
Internal Power Supply - Conceptual Design
Ventilation - Conceptual Design
Heating - Conceptual Design
Electrical installation and connection insulation resistance measurements
Building electrical network grounding resistance measurements
Building foundation as-built measurement plan
Building and engineering network as-built measurement plan
Building cadastral survey
Building commissioning

Basic Middle Complete
Construction site container
Construction site fencing
Scaffolding rental, assembly, disassembly
Crane for house assembly
Sanitary facilities during construction
Construction waste disposal

Basic Middle Complete
Excavation of construction pit
Installation of Fortex Geo PP200 geotextile
Creation and compaction of a 400mm sand layer
Creation and compaction of a 200mm 16mm-40mm crushed stone layer
Creation and compaction of a 50mm 2mm-8mm crushed stone layer
Installation of L-shaped formwork elements (EPS 300 with 5mm cement-fiber board plinth finish)
250mm foundation insulation layer (EPS 100)
Rebar installation in two layers (D10-D16mm)
Concrete works 150mm-300mm (C30/37)

Basic Middle Complete
Installation of sewage systems in foundations
Installation of water pipes in foundations with corrugated protective tubing (Uponor 16/2mm)
Installation of underfloor heating pipes in foundations (Uponor 16/2mm)
Creation of sewage outlets in walls and integration of floor drains

Basic Middle Complete
Installation of socket and switch boxes (ABB)
Cable installation
Building distribution panel wiring
Installation of sockets and switches (Jung LS 990 series, white)
Lighting fixture installation
Facade lighting
Construction of external networks
Grounding loop installation

Basic Middle Complete
Vertical facade board (UYSK 21x120mm) (Spruce), primed and painted twice
Mouse barrier around the lower perimeter of the ground floor exterior walls
Lathing (28x70mm)
Lathing (25x50mm)
Diffusion membrane (Siga Majcoat 150)
Gypsum board Norgips GU (9.5mm)
Wooden frame C24 (45x195mm)
Thermal insulation Isover Standard 35 (200mm)
Vapor barrier (Siga Majpell 5)
Lathing (45x45mm)
Thermal insulation Isover Standard 35 (50mm)
OSB 3 (10mm)
Gypsum board Norgips GKB (12.5mm)
Plywood (Pine) (15mm) (for wet areas)
Gypsum board Norgips GKBI (12.5mm) (for wet areas)

Basic Middle Complete
Gypsum board Norgips GKB (12.5mm)
OSB 3 (10mm)
Wooden frame C24 (45x120-195mm)
Thermal insulation Isover Standard 35 (120-200mm)
OSB 3 (10mm)
Gypsum board Norgips GKB (12.5mm)
Plywood (Pine) (12mm) (for wet areas)
Gypsum board Norgips GKBI (12.5mm) (for wet areas)

Basic Middle Complete
Gypsum board Norgips GKB (12.5mm)
OSB 3 (10mm)
Wooden frame C24 (45x95mm)
Thermal insulation Isover Standard 35 (100mm)
OSB 3 (10mm)
Gypsum board Norgips GKB (12.5mm)
Plywood (Pine) (12mm) (for wet areas)
Gypsum board Norgips GKBI (12.5mm) (for wet areas)

Basic Middle Complete
RORBO underfloor heating system
Durelis 22mm
Wooden frame C24 (45x220-245mm)
Insulation Isover Standard 35 (100-250mm)
Lathing (28x70mm)
Gypsum board Norgips GKB (12.5mm)
Gypsum board Norgips GKBI (12.5mm) (for wet areas)

Basic Middle Complete
Concrete roof tile Monier EVO (dark gray)
Lathing (45x45mm)
Lathing (45x45mm)
Diffusion membrane (Siga Majcoat 150)
Wooden frame C24 (45x245mm)
Thermal insulation Isover Standard 35 (250mm)
Wooden frame C24 (45x95mm)
Thermal insulation Isover Standard 35 (100mm)
Vapor membrane (Siga Majpell 5)
Lathing (45x45mm)
Thermal insulation Isover Standard 35 (50mm)
Gypsum board Norgips GKB (12.5mm)
Gypsum board Norgips GKBI (12.5mm) (for wet areas)

Basic Middle Complete
Concrete roof tile Monier EVO (dark gray)
Lathing (45x45mm)
Lathing (45x45mm)
Diffusion membrane (Siga Majcoat 150)
Factory-manufactured roof trusses
Mechanical installation of Isover KV041 thermal insulation
Vapor membrane (Siga Majpell 5)
Lathing (28x70mm)
Gypsum board Norgips GKB (12.5mm)
Gypsum board Norgips GKBI (12.5mm) (for wet areas)

Basic Middle Complete
Toode Classic PURAL BT MATT Z350 0.5 mm
Icopal Fel’x
Tongue-and-groove roof decking (20 mm)
Lathing (45x45mm)
Diffusion membrane (Siga Majcoat 150)
Wooden frame C24 (45x245mm)
Thermal insulation Isover Standard 35 (250mm)
Wooden frame C24 (45x95mm)
Thermal insulation Isover Standard 35 (100mm)
Vapor membrane (Siga Majpell 5)
Lathing (45x45mm)
Thermal insulation Isover Standard 35 (50mm)
Gypsum board Norgips GKB (12.5mm)
Gypsum board Norgips GKBI (12.5mm) (for wet areas)

Basic Middle Complete
Toode Classic PURAL BT MATT Z350 0.5 mm
Icopal Fel’x
Tongue-and-groove roof decking (20 mm)
Lathing (45x45mm)
Diffusion membrane (Siga Majcoat 150)
Factory-manufactured roof trusses
Mechanical installation of Isover KV041 thermal insulation
Vapor membrane (Siga Majpell 5)
Lathing (28x70mm)
Gypsum board Norgips GKB (12.5mm)
Gypsum board Norgips GKBI (12.5mm) (for wet areas)

Basic Middle Complete
IKO Powerflex 5000 torch-on top layer
IKO Base P3000 torch-on base layer
OSB 3 (18 mm)
Wooden frame C24 (45x195-245 mm)
Ceiling finish board (UYSK 21x120mm) (Spruce), primed and painted twice

Basic Middle Complete
Vertical facade board (UYSK 21x120mm) (Spruce), primed and painted twice
Mouse barrier around the lower perimeter
Lathing (28x70mm)
Wooden frame C24 (45x120-145mm)

Basic Middle Complete
IKO Powerflex 5000 torch-on top layer
IKO Base P3000 torch-on base layer
OSB 3 (18 mm)
Wooden frame C24 (45x195-245 mm)

Basic Middle Complete
PVC triple-glazed windows
6-chamber 82 mm Salamander bluEnergy window frame profile
48 mm glass unit with Termix spacer
Roto NT hardware

Basic Middle Complete
Terrace board, impregnated, brown (28x120 mm) (pine)
Upper wooden frame C24, impregnated (45x145 mm) (cc 500 mm)
Load-bearing beams C24, impregnated, 2x(45x145 mm)

Basic Middle Complete
Installation of exterior wall elements
Installation of interior wall elements
Installation of ceiling elements
Installation of roof elements
Sealing of connections for diffusion and vapor membranes, closing of assembly pockets
Assembly materials (screws, slings, tapes, construction fittings, etc.)
Glued laminated timber beams GL24h

Basic Middle Complete
Preparation of connections for heat pump installation
Air-to-water heat pump Alpha Innotec L6 Split-HT 6
Underfloor heating manifold Uponor

Basic Middle Complete
Circular PE air duct installation
Heat recovery unit Brink Flair 325

Basic Middle Complete
Wall and ceiling plastering (Flugger system)
Wall and ceiling painting (Flugger paint)
Waterproofing for wet areas (Mira)
Wall tiling in bathrooms (Tile budget €40/m²)
Floor tiling in bathrooms and utility rooms (Tile budget €40/m²)
Installation of parquet or vinyl flooring (Flooring budget €40/m²)
Custom-made painted or veneered MDF baseboards
Custom-made painted or veneered solid wood interior doors
Custom-made stairs with oak steps

Basic Middle Complete
Toilet
Vanity unit with sink
Sink faucet
Mirror
Bathtub
Bathtub faucet
Towel warmer
Shower faucet
Shower screen

Basic Middle Complete
Kitchen unit – laminated fiberboard frame, laminated particleboard with HPL coating, painted MDF fronts, BLUM hardware with soft-close mechanisms, oak countertop
Induction cooktop
Extractor hood
Oven
Microwave oven
Dishwasher
Refrigerator
Freezer
Sink
Sink faucet

Basic Middle Complete
Material transportation to the site in the Sigulda area

*transportation costs depend on the location of the site

Frequently asked questions

Yes, we can adapt the designs to your preferences or create something entirely custom.

Yes, by separate agreement, we can handle all documentation tasks, from coordinating the building permit to the building’s commissioning.

Yes, you will have the opportunity to fully customize the interior of the house to your preferences. We will coordinate all interior designs and materials with you during the process. Items such as tiles, flooring, electrical appliances, and bathroom fixtures can be selected from our offer, our partners, or any supplier of your choice.

You can find the house’s technical specifications and descriptions of included items on our website under each respective product, by selecting the appropriate package.

By prior arrangement, we can arrange a visit to one of our completed projects. We are always open to showing you a project that is still under construction, which is a great opportunity to see what the house consists of. At our factory in Lauku street 1, Sigulda, you can also view demo modular homes, and we would be happy to show and explain the manufacturing process to you.

If you choose one of our standard products from the offering, the completion time for a modular house would be 10 to 14 weeks. If changes are made or a custom-designed project is ordered, the timeline may slightly increase. For private homes, the construction timeline from receiving the building permit and starting work on-site to the completed house is 4 to 6 months, depending on the chosen project.

20% of the contract amount – upon signing the contract
40% of the contract amount – before the start of the modular house production
30% of the contract amount – before the start of interior finishing work
10% of the contract amount – after signing the acceptance/handover certificate
For private houses, the payment procedure is agreed upon before signing the contract, depending on the scope of work and the customer’s financing method.